IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 508 Machinery, Equipment, And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0552 # 09 Y:2023 09 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,062 $48,000 Implemented
LE0552 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $231 $320 Implemented
LE0552 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,712 $2,500 Implemented
LE0552 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $790 $570 Implemented
LE0552 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $608 $100 Implemented
UD0818 # 16 Y:2010 16 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,929 $0 Implemented
UD0818 # 15 Y:2010 15 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,060 $0 Implemented
UD0818 # 09 Y:2010 09 2010 USE OPTIMUM TEMPERATURE $7,200 $0 Implemented
UD0818 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $0 Implemented
UD0818 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $5,865 $0 Implemented
UD0818 # 03 Y:2010 03 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $103,369 $0 Implemented
UD0818 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,876 $0 Implemented
IA0440 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $130 Implemented
IA0440 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $386 $60 Implemented
IA0440 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $312 $72 Implemented
IA0440 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $241 $200 Implemented
IA0440 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $2,112 Implemented
IA0426 # 11 Y:2008 11 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $28,890 $8,900 Implemented
IA0426 # 07 Y:2008 07 2008 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,743 $185 Implemented
IA0426 # 06 Y:2008 06 2008 PAY UTILITY BILLS ON TIME $16,112 $0 Implemented
IA0426 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,748 $2,450 Implemented
IA0426 # 03 Y:2008 03 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $3,565 $225 Implemented
IA0426 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $678 $847 Implemented
IA0426 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,200 $10,307 Implemented