IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0152 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,503 $8,301 Not Implemented
BS0152 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,594 $114,156 Not Implemented
GT0949 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,586 $4,500 Not Implemented
GT0949 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,159 $451 Implemented
GT0949 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,978 $400 Implemented
GT0949 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,356 $2,000 Not Implemented
GT0949 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,422 $400 Not Implemented
GT0949 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $425 Not Implemented
GT0949 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $1,392 $5,106 Not Implemented
BS0126 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $53 Not Implemented
BS0126 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,569 $1,440 Not Implemented
BS0126 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $130 $20 Not Implemented
BS0126 # 04 Y:2019 04 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,406 $13,000 Not Implemented
NL0009 # 01 Y:2017 01 2017 REDESIGN PROCESS $37,689 $38,000 Not Implemented
NL0009 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,263 $10,000 Not Implemented
NL0009 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,632 $4,788 Implemented
NL0009 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $3,360 Implemented
OK0936 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $144 $316 Not Implemented
OK0936 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $323 $450 Implemented
OK0936 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,106 $35,525 Not Implemented
OK0936 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $46,436 $29,439 Implemented
SU0372 # 07 Y:2014 07 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $305 $720 Not Implemented
SU0372 # 08 Y:2014 08 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,087 $56,082 Not Implemented
SU0372 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $330 $365 Implemented
SU0372 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $285 $0 Not Implemented