IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 516 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0566 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,974 $1,450 n/a
LE0566 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,444 $1,000 n/a
LE0566 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,530 $640 n/a
LE0566 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,023 $1,320 n/a
LE0566 # 08 Y:2024 08 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,054 $17,765 n/a
LE0566 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $403 $210 n/a
LE0566 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,026 $100 n/a
LE0566 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $6,466 $600 n/a
DL0105 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $20,300 $8,000 Not Implemented
DL0105 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $54,800 $200 Not Implemented
DL0105 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,200 $13,500 Implemented
DL0105 # 10 Y:2013 10 2013 USE RADIANT HEATER FOR SPOT HEATING $154,000 $1,000,000 Implemented
DL0105 # 11 Y:2013 11 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $82,900 $420,000 Implemented
DL0105 # 04 Y:2013 04 2013 ADD AREA LIGHTING SWITCHES $18,950 $1,400 Implemented
DL0105 # 05 Y:2013 05 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $16,300 $500 Not Implemented
DL0105 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,400 $590 Not Implemented
DL0105 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,200 $2,300 Not Implemented
DL0105 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,000 $80 Implemented
DL0105 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,350 $3,200 Not Implemented
UF0423 # 02 Y:2009 02 2009 USE OPTIMUM TEMPERATURE $45,100 $0 Not Implemented
UF0423 # 13 Y:2009 13 2009 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,000 $0 Not Implemented
UF0423 # 12 Y:2009 12 2009 INSULATE BARE EQUIPMENT $159,410 $5,591 Not Implemented
UF0423 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,767 $1,301 Implemented
UF0423 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $753 $0 Implemented
UF0423 # 05 Y:2009 05 2009 REDESIGN PROCESS $206,074 $300,000 Not Implemented