IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 721 Laundry, Cleaning, & Garment Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0260 # 09 Y:2025 09 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,105 $0 n/a
DL0260 # 08 Y:2025 08 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,619 $9,000 n/a
DL0260 # 07 Y:2025 07 2025 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,580 $0 n/a
DL0260 # 06 Y:2025 06 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,800 $60,000 n/a
DL0260 # 05 Y:2025 05 2025 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,400 $20,000 n/a
DL0260 # 01 Y:2025 01 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $30,961 $16,000 n/a
DL0260 # 02 Y:2025 02 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $4,398 $0 n/a
DL0260 # 03 Y:2025 03 2025 RECOVER WASTE HEAT FROM EQUIPMENT $58,770 $200,000 n/a
DL0260 # 04 Y:2025 04 2025 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,763 $5,000 n/a
UU0273 # 03 Y:2025 03 2025 USE PHOTOCELL CONTROLS $176 $295 n/a
UU0273 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $138 $350 n/a
UU0273 # 02 Y:2025 02 2025 INCREASE EFFICIENCY OF TRUCKS $12,640 $23,790 n/a
UU0273 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $1,070 $2,290 n/a
LS0224 # 06 Y:2024 06 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,486 $113,400 Not Implemented
LS0224 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $1,413 Implemented
LS0224 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $17,495 $20,000 Not Implemented
LS0224 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,962 $75 Implemented
LS0224 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $25 Implemented
LS0224 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,021 $514,800 Not Implemented
LS0224 # 05 Y:2024 05 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $175,678 $600,000 Implemented
CI0026 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $500 $2,000 n/a
CI0026 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,873 $8,074 n/a
CI0026 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $21,942 $60,000 n/a
CI0026 # 01 Y:2023 01 2023 REPLACE BOILER $40,642 $20,000 n/a
CI0026 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,454 $2,400 n/a