IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 7389 Business Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0238 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,731 $5,916 Implemented
UU0238 # 04 Y:2024 04 2024 CLEAN CONDENSER TUBES $3,894 $3,890 Implemented
UU0238 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,670 $22,500 Not Implemented
UU0238 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,624 $12,621 Implemented
UU0238 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,223 $4,080 Implemented
AS0532 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,151 $182,215 Not Implemented
AS0532 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $50 $138 Not Implemented
AS0532 # 01 Y:2022 01 2022 AIR CONDITION ONLY SPACE NECESSARY $5,668 $800 Not Implemented
AS0532 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $230 $25 Not Implemented
AS0532 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $300 Not Implemented
AS0532 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $533 $158 Not Implemented
AS0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,744 $6,177 Not Implemented
AS0532 # 04 Y:2022 04 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,148 $2,555 Not Implemented
OR0714 # 01 Y:2019 01 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $56,799 $168,000 Not Implemented
OR0714 # 02 Y:2019 02 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,772 $23,842 Not Implemented
OR0714 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,372 $29,440 Not Implemented
OR0714 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,441 $23,733 Not Implemented
OR0714 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,732 $10,902 Not Implemented
UK1506 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,255 $0 Not Implemented
UK1506 # 11 Y:2015 11 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,642 $1,284 Not Implemented
UK1506 # 06 Y:2015 06 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,452 $1,000 Implemented
UK1506 # 12 Y:2015 12 2015 UPGRADE CONTROLS ON COMPRESSORS $1,281 $5,000 Not Implemented
UK1506 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $829 $1,200 Not Implemented
UK1506 # 14 Y:2015 14 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,725 $4,500 Not Implemented
UK1506 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,531 $2,478 Implemented