IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 7534 Tire Retreading And Repair Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0084 # 10 Y:2012 10 2012 OPERATE BOILERS ON HIGH FIRE SETTING $10,918 $1,770 Implemented
MZ0084 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $1,483 $2,500 Implemented
MZ0084 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $6,939 $0 Implemented
MZ0084 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,142 $1,000 Not Implemented
MZ0084 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,736 $11,730 Implemented
MZ0084 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,831 $37,520 Not Implemented
MZ0084 # 04 Y:2012 04 2012 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,897 $2,400 Not Implemented
MZ0084 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,987 $500 Not Implemented
MZ0084 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $3,500 Implemented
MZ0084 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $15,200 Implemented
AS0388 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $1,489 $815 Not Implemented
AS0388 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,505 $1,477 Not Implemented
AS0388 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $953 $1,400 Not Implemented
AS0388 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,196 $1,247 Not Implemented
AS0388 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $283 $800 Not Implemented
AS0388 # 03 Y:2004 03 2004 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $366 $1,530 Not Implemented
AS0388 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,081 $440 Implemented
MI0037 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,419 $250 Implemented
MI0037 # 06 Y:2002 06 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,104 $3,545 Not Implemented
MI0037 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,505 $1,250 Not Implemented
MI0037 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,361 $120 Implemented
MI0037 # 02 Y:2002 02 2002 UPGRADE OBSOLETE EQUIPMENT $12,400 $24,000 Implemented
MI0037 # 01 Y:2002 01 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,994 $1 Implemented