IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 80 Health Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0624 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,440 $1,764 Implemented
LS0624 # 03 Y:2024 03 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,783 $89,810 Implemented
LS0624 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,604 $514,800 Implemented
LS0624 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,878 $200 Implemented
OK1114 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,371 $9,240 Implemented
OK1114 # 03 Y:2024 03 2024 OPERATE BOILERS ON HIGH FIRE SETTING $3,357 $16,000 Implemented
OK1114 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $3,939 $0 Implemented
OK1114 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $0 Implemented
MZ1004 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,256 $21,075 Implemented
MZ1004 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $971 $598 Implemented
MZ1004 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $227 $250 Implemented
OK1110 # 05 Y:2024 05 2024 OPERATE BOILERS ON HIGH FIRE SETTING $8,594 $22,000 Implemented
OK1110 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $3,264 $1,330 Implemented
OK1110 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,945 $56,850 Implemented
OK1110 # 08 Y:2024 08 2024 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $996 $160 Implemented
OK1110 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,681 $1,861 Implemented
LS0424 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $1,676 Implemented
LS0424 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,937 $200 Implemented
LS0424 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $16,625 $1,500 Implemented
UU0240 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $1,387 Implemented
UU0240 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $977 $113 Implemented
UU0240 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,286 $1,500 Implemented
UU0240 # 02 Y:2024 02 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $1,601 $7,755 Implemented
OK1103 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,305 $190,944 Implemented
OK1103 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,866 $18,693 Implemented