IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 80 Health Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0340 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,618 $12,938 Implemented
MI0340 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,892 $24,640 Implemented
MI0340 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,630 $44,639 Implemented
UA0166 # 02 Y:2016 02 2016 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,491 $80 Implemented
UA0166 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,248 $80 Implemented
UA0166 # 05 Y:2016 05 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,707 $120 Implemented
UA0166 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $617 $200 Implemented
UA0166 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,666 $38,071 Implemented
UA0166 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,753 $1,050 Implemented
IA0545 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $231 $292 Implemented
IA0545 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,267 $4,620 Implemented
IA0545 # 04 Y:2015 04 2015 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,172 $620 Implemented
IA0545 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,509 $115,341 Implemented
IA0545 # 01 Y:2015 01 2015 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $37,834 $27,000 Implemented
UD0902 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $671 $6,000 Implemented
UD0902 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,433 $1,000 Implemented
OK0869 # 13 Y:2013 13 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,890 $21,025 Implemented
OK0869 # 09 Y:2013 09 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $38,010 $23,834 Implemented
OK0869 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,056 $2,140 Implemented
OK0869 # 04 Y:2013 04 2013 KEEP BOILER TUBES CLEAN $9,106 $3,420 Implemented
OK0837 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,778 $1,400 Implemented
OK0837 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,797 $18,000 Implemented
OK0837 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $670 $4,525 Implemented
OK0837 # 02 Y:2012 02 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $17,278 $4,230 Implemented