IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 80 Health Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1110 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,681 $1,861 n/a
OK1110 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,588 $280,800 n/a
OK1110 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $3,264 $1,330 n/a
OK1110 # 08 Y:2024 08 2024 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $996 $160 n/a
OK1110 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,219 $12,400 n/a
OK1110 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,945 $56,850 n/a
OK1110 # 05 Y:2024 05 2024 OPERATE BOILERS ON HIGH FIRE SETTING $8,594 $22,000 n/a
OK1110 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $5,873 $7,892 n/a
OK1103 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,866 $18,693 n/a
OK1103 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,305 $190,944 n/a
OK1103 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,355 $1,490 n/a
OK1103 # 04 Y:2024 04 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,069 $8,525 n/a
OK0869 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,817 $16,000 Not Implemented
OK0869 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,981 $12,378 Not Implemented
OK0869 # 03 Y:2013 03 2013 REPAIR OR REPLACE STEAM TRAPS $999 $1,850 Not Implemented
OK0869 # 04 Y:2013 04 2013 KEEP BOILER TUBES CLEAN $9,106 $3,420 Implemented
OK0869 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $13,630 $23,667 Not Implemented
OK0869 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,056 $2,140 Implemented
OK0869 # 07 Y:2013 07 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,267 $20,900 Not Implemented
OK0869 # 08 Y:2013 08 2013 INSTALL SET-BACK TIMERS $2,563 $0 Not Implemented
OK0869 # 09 Y:2013 09 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $38,010 $23,834 Implemented
OK0869 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,424 $21,368 Not Implemented
OK0869 # 11 Y:2013 11 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $22,243 $0 Not Implemented
OK0869 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,035 $5,256 Not Implemented
OK0869 # 13 Y:2013 13 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,890 $21,025 Implemented