Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 80 | Health Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0098 # 03 Y:2024 | 03 | 2024 | RECOVER AND REUSE WASTE MATERIAL | $820 | $6,490 | n/a |
NL0098 # 02 Y:2024 | 02 | 2024 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $4,787 | $10,040 | n/a |
NL0098 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $6,690 | $32,200 | n/a |
LS0624 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,440 | $1,764 | n/a |
OK1114 # 05 Y:2024 | 05 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $304 | $278 | n/a |
OK1114 # 07 Y:2024 | 07 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $609 | $17,437 | n/a |
OK1114 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $0 | n/a |
OK1114 # 03 Y:2024 | 03 | 2024 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,357 | $16,000 | n/a |
OK1114 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,371 | $9,240 | n/a |
OK1114 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,465 | $327,600 | n/a |
OK1114 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $3,939 | $0 | n/a |
LS0624 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,604 | $514,800 | n/a |
LS0624 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,783 | $89,810 | n/a |
LS0624 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,878 | $200 | n/a |
MZ1004 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $971 | $598 | n/a |
MZ1004 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $227 | $250 | n/a |
MZ1004 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,256 | $21,075 | n/a |
MZ1004 # 04 Y:2024 | 04 | 2024 | REPLACE BOILER | $15,382 | $100,750 | n/a |
OK1110 # 07 Y:2024 | 07 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,681 | $1,861 | n/a |
OK1110 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,588 | $280,800 | n/a |
OK1110 # 05 Y:2024 | 05 | 2024 | OPERATE BOILERS ON HIGH FIRE SETTING | $8,594 | $22,000 | n/a |
OK1110 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,219 | $12,400 | n/a |
OK1110 # 08 Y:2024 | 08 | 2024 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $996 | $160 | n/a |
OK1110 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,873 | $7,892 | n/a |
OK1110 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $3,264 | $1,330 | n/a |