IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 8221 Colleges And Universities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0528 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,850 $2,800 Not Implemented
AS0528 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $212 $845 Not Implemented
AS0528 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $894 $700 Not Implemented
AS0528 # 06 Y:2022 06 2022 SHUT OFF PILOTS IN STANDBY EQUIPMENT $918 $105 Not Implemented
AS0528 # 05 Y:2022 05 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $924 $460 Not Implemented
UU0174 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,383 $85,347 Implemented
UU0174 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $476 $1,925 Not Implemented
UU0174 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $200 Implemented
UU0174 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $5,107 $43,420 Not Implemented
UU0174 # 01 Y:2021 01 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $24,060 $178,852 Implemented
UU0165 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $660 Not Implemented
UU0165 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $660 $660 Implemented
UU0165 # 04 Y:2020 04 2020 AIR CONDITION ONLY SPACE NECESSARY $1,220 $1,500 Implemented
UU0165 # 03 Y:2020 03 2020 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,520 $7,400 Not Implemented
UU0165 # 02 Y:2020 02 2020 REDUCE VENTILATION AIR $4,090 $1,125 Not Implemented
UU0165 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $7,045 $7,045 Not Implemented
UU0162 # 01 Y:2020 01 2020 REDUCE FLUID FLOW RATES $8,259 $17,871 Implemented
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented
UU0162 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,096 $5,759 Implemented
UU0162 # 02 Y:2020 02 2020 UPGRADE OBSOLETE EQUIPMENT $5,390 $7,024 Not Implemented
TT0110 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $11,915 $11,497 Not Implemented
TT0110 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,000 $60,000 Implemented
TT0110 # 01 Y:2013 01 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $362,330 $650,000 Implemented