Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 871 | Engineering & Architectural Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS0001 # 06 Y:2017 | 06 | 2017 | INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING | $1,040 | $0 | Not Implemented |
LS0001 # 05 Y:2017 | 05 | 2017 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $430 | $380 | Implemented |
LS0001 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $257 | $0 | Not Implemented |
LS0001 # 03 Y:2017 | 03 | 2017 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $520 | $1,200 | Implemented |
LS0001 # 02 Y:2017 | 02 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,143 | $420 | Implemented |
LS0001 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,268 | $0 | Not Implemented |
BD0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,169 | $11,159 | Implemented |
BD0434 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,463 | $1,425 | Implemented |
BD0434 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $15,503 | $11,000 | Not Implemented |
BD0434 # 01 Y:2013 | 01 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $48,621 | $13,862 | Implemented |
BD0434 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $1,272 | $1,475 | Implemented |
UM0430 # 02 Y:2013 | 02 | 2013 | RECOVER MECHANICAL ENERGY | $18,100 | $15,500 | Not Implemented |
UM0430 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,154 | $29,153 | Implemented |
UM0430 # 01 Y:2013 | 01 | 2013 | RECOVER MECHANICAL ENERGY | $45,000 | $8,000 | Not Implemented |
UM0430 # 03 Y:2013 | 03 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,100 | $5,500 | Not Implemented |
UM0421 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $494 | $3,525 | Implemented |
UM0421 # 01 Y:2013 | 01 | 2013 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $75,276 | $110,000 | Not Implemented |
UM0421 # 03 Y:2013 | 03 | 2013 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,857 | $4,000 | Not Implemented |
UD0829 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $547 | $500 | Implemented |
UD0829 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,121 | $500 | Implemented |
UD0829 # 06 Y:2011 | 06 | 2011 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $1,738 | $5,214 | Implemented |
UD0829 # 11 Y:2011 | 11 | 2011 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $2,189 | $9,500 | Not Implemented |
UD0829 # 12 Y:2011 | 12 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,647 | $25 | Not Implemented |
UD0829 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,046 | $3,750 | Not Implemented |
UD0829 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,862 | $313 | Not Implemented |