IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 873 Research And Testing Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0423 # 03 Y:2013 03 2013 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,300 $6,500 Not Implemented
UM0423 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,224 $5,550 Implemented
UM0423 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $454 $175 Implemented
UM0393 # 11 Y:2011 11 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,143 $2,500 Not Implemented
UM0393 # 10 Y:2011 10 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,545 $23,900 Not Implemented
UM0393 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $1,916 $1,200 Implemented
UM0393 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,408 $1,533 Implemented
UM0393 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,578 $200 Not Implemented
UM0393 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,888 $5,440 Implemented
UM0393 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $7,039 $6,006 Not Implemented
UM0393 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,581 $2,500 Implemented
UM0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $29,225 Implemented
UM0393 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,190 $18,432 Not Implemented
UM0393 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,825 $18,696 Implemented
UM0393 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $12,938 $600 Implemented
SD0378 # 02 Y:2006 02 2006 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $27,521 $0 Not Implemented
SD0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,312 $6,160 Implemented
SD0378 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $2,957 $384 Implemented
SD0378 # 05 Y:2006 05 2006 USE MINIMUM STEAM OPERATING PRESSURE $1,208 $0 Implemented
SD0378 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,124 $15,000 Implemented
SD0378 # 03 Y:2006 03 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,633 $0 Implemented
SD0378 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $170,338 $792,300 Not Implemented
SU0149 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,888 $500 Not Implemented
SU0149 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $3,295 $6,573 Not Implemented
SU0149 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $7,864 $4,382 Not Implemented