IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,681

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0564 # 01 Y:2024 01 2024 DISCONNECT BALLASTS $103 $0 Implemented
SU0564 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,420 $332 Implemented
UD1098 # 07 Y:2025 07 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $0 Implemented
SU0564 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,312 $118 Implemented
UD1098 # 04 Y:2025 04 2025 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,612 $306 Implemented
UD1098 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $1,235 Implemented
UF0624 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $5,844 $6,000 Implemented
UF0624 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,280 $0 Implemented
NT0038 # 02 Y:2025 02 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,913 $0 Implemented
NT0038 # 01 Y:2025 01 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $370 Implemented
UF0624 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,908 $14,359 Implemented
LS0325 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,309 $0 Implemented
LS0325 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,806 $4,618 Implemented
NT0038 # 04 Y:2025 04 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,311 $0 Implemented
NT0038 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,524 $5,609 Implemented
TT0325 # 02 Y:2025 02 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $68,822 $200,000 Implemented
TT0325 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $4,068 $15,000 Implemented
TT0325 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,955 $1,000 Implemented
LS0225 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $2,927 Implemented
LS0225 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,695 $0 Implemented
LS0225 # 03 Y:2025 03 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,877 $29,510 Implemented
LS2502 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $905 $45 Implemented
LS2502 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,783 $6,965 Implemented
LS2502 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $6,307 $300 Implemented
LS2502 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,066 $0 Implemented