IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,656

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $230 Implemented
GT0496 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,890 $750 Implemented
AS0091 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,516 $0 Implemented
AS0091 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27 $141 Implemented
AS0091 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $150 $110 Implemented
MA0281 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $3,492 Implemented
MA0281 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $400 Implemented
MA0281 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,812 $320 Implemented
MA0281 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $436 $0 Implemented
IA0058 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,306 $1,000 Implemented
IA0058 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,091 $4,600 Implemented
IA0058 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,994 $250 Implemented
MO0094 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,764 $35,485 Implemented
MO0094 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,472 $1,418 Implemented
MO0094 # 06 Y:1993 06 1993 USE OPTIMUM TEMPERATURE $528 $200 Implemented
ND0161 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $840 Implemented
ND0161 # 05 Y:1993 05 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $527 $80 Implemented
UF0070 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $4,866 $2,520 Implemented
UF0070 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,941 $8,198 Implemented
UF0070 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,113 $2,339 Implemented
UF0070 # 12 Y:1993 12 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,248 $0 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented