IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,054

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0203 # 12 Y:1991 12 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,300 Implemented
CO0203 # 13 Y:1991 13 1991 INSTALL TIMERS AND/OR THERMOSTATS $660 $900 Implemented
CO0203 # 14 Y:1991 14 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $200 Implemented
CO0203 # 15 Y:1991 15 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,000 $1,700 Implemented
CO0203 # 16 Y:1991 16 1991 INSULATE BARE EQUIPMENT $1,300 $1,800 Implemented
AM0111 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,760 $0 Implemented
AM0111 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $6,300 $7,100 Implemented
AM0111 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $3,530 $5,700 Implemented
AM0111 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,130 $5,540 Implemented
AM0111 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $1,820 $4,800 Implemented
AM0111 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $34 Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
GT0427 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $3,987 Implemented
GT0427 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $1,060 $0 Implemented
GT0427 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,280 $2,000 Implemented
GT0428 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $429 $0 Implemented
GT0428 # 02 Y:1991 02 1991 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $562 $400 Implemented
GT0428 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,500 Implemented
GT0428 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,170 $2,400 Implemented
GT0428 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $839 Implemented
GT0428 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $68 $563 Implemented