Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67,034
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0475 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,779 | $895 | Implemented |
AS0475 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $159 | $752 | Implemented |
MA0808 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,454 | $12,318 | Implemented |
MA0808 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,080 | $2,000 | Implemented |
SF0543 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,772 | $757 | Implemented |
SF0543 # 02 Y:2019 | 02 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $24,608 | $15,012 | Implemented |
SF0543 # 03 Y:2019 | 03 | 2019 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $637 | $654 | Implemented |
SF0543 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,245 | $4,917 | Implemented |
SF0543 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,652 | $12,363 | Implemented |
SF0543 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,639 | $23,288 | Implemented |
IP0120 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,145 | $4 | Implemented |
IP0120 # 02 Y:2019 | 02 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $835 | $0 | Implemented |
IP0120 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223 | $22 | Implemented |
IP0120 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $473 | $256 | Implemented |
IP0120 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,019 | $4,963 | Implemented |
IP0120 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $691 | $3,215 | Implemented |
WM0137 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,626 | $15,385 | Implemented |
WM0137 # 05 Y:2019 | 05 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $2,291 | $2,780 | Implemented |
WM0137 # 08 Y:2019 | 08 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $629 | $1,920 | Implemented |
MI0356 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,750 | $42,002 | Implemented |
MI0356 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,615 | $19,558 | Implemented |
MI0356 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,928 | $8,500 | Implemented |
MI0356 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,814 | $480 | Implemented |
MI0356 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,569 | $2,020 | Implemented |
MI0355 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $103,161 | $14,000 | Implemented |