IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,436

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0147 # 05 Y:2008 05 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $395 $250 Implemented
IC0147 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,605 $0 Implemented
IC0147 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $133 $398 Implemented
IC0147 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,952 $15,562 Implemented
IC0147 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $246 Implemented
IC0147 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,527 $30,225 Implemented
IC0147 # 11 Y:2008 11 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,598 $9,911 Implemented
IC0147 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,138 $1,380 Implemented
IC0147 # 13 Y:2008 13 2008 UPGRADE OBSOLETE EQUIPMENT $17,075 $5,520 Implemented
IC0147 # 14 Y:2008 14 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,784 $8,670 Implemented
IC0147 # 15 Y:2008 15 2008 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $5,100 $0 Implemented
MZ0024 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $900 Implemented
MZ0024 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,181 $32,800 Implemented
MZ0028 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $457 $500 Implemented
MZ0028 # 04 Y:2008 04 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $11,380 $7,000 Implemented
MI0173 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,609 $1,563 Implemented
MI0173 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,203 $950 Implemented
MI0173 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,034 $7,000 Implemented
MI0173 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,963 $1,210 Implemented
MI0173 # 07 Y:2008 07 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,484 $4,400 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
DL0027 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $8,800 $0 Implemented