IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,519

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0302 # 08 Y:2023 08 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,956 $965 n/a
NT0018 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,361 $4,553 Not Implemented
NT0018 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,653 $1,258 Not Implemented
NT0018 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,450 $1,311 Not Implemented
NT0018 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,420 $11,457 Implemented
NT0018 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $0 Not Implemented
NT0018 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $8,460 $6,082 Not Implemented
NT0018 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
NT0018 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,092 $5,443 Not Implemented
UD1067 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $1,800 n/a
UD1067 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $965 $6,400 n/a
UD1067 # 03 Y:2023 03 2023 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $377 $250 n/a
UD1067 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,940 $143,080 n/a
OR0779 # 02 Y:2023 02 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,749 $0 Not Implemented
OR0779 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,725 $57,101 Not Implemented
ORC010 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,713 $12,000 n/a
ORC010 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,211 $2,500 n/a
ORC010 # 03 Y:2023 03 2023 REPLACE BOILER $3,391 $30,000 n/a
ORC010 # 04 Y:2023 04 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $8,755 $1,000 n/a
ORC010 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $16,690 $1,000 n/a
SJ0008 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,195 $77,365 Not Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SJ0008 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $80 $0 Not Implemented
SJ0008 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $126 $436 Not Implemented
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented