IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,606

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8409 # 03 Y:2024 03 2024 REPAIR AND ELIMINATE STEAM LEAKS $38,478 $2,971 n/a
LE0579 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,555 $510 Implemented
LE0579 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,704 $2,300 Implemented
LE0579 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,383 $5,000 Not Implemented
LE0579 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,804 $49,222 Implemented
LE0579 # 05 Y:2024 05 2024 REPLACE BOILER $96,643 $400,000 Not Implemented
SU0554 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,596 $0 Not Implemented
SU0554 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $0 Not Implemented
SU0554 # 04 Y:2024 04 2024 DISCONNECT BALLASTS $25 $0 Not Implemented
SU0554 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,553 $84 Implemented
SU0554 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,419 $54 Implemented
SU0554 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $355 $466 Not Implemented
SU0554 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $82,048 $526,750 Implemented
SU0554 # 09 Y:2024 09 2024 USE HEAT PUMP FOR SPACE CONDITIONING $12,437 $105,375 Implemented
NL0094 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $72,558 $568,000 Not Implemented
NL0094 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $4,500 Not Implemented
NL0094 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,003 $2,741 Not Implemented
NL0094 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $731 $2,110 Not Implemented
NL0094 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $583 Not Implemented
NL0094 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $332 $160 Not Implemented
NL0094 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $196 $97 Not Implemented
UF0619 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,482 $6,000 Implemented
UF0619 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,318 $25,440 Not Implemented
UF0619 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,655 $13,445 Implemented
UF0619 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,989 $36,000 Not Implemented