IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,588

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2308 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $985 $7,376 Not Implemented
SD0636 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,805 $300 Not Implemented
SD0636 # 02 Y:2023 02 2023 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $28,974 $0 Not Implemented
SD0636 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,227 $4,339 Not Implemented
SD0636 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,654 $4,172 Implemented
SD0636 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $111,629 $154,568 Not Implemented
SD0636 # 06 Y:2023 06 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,771 $37,377 Not Implemented
SD0636 # 07 Y:2023 07 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $473 $0 Not Implemented
SD0636 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,560 $30,577 Not Implemented
SD0636 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $72,872 $0 Not Implemented
UW2305 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $4,074 Implemented
UW2305 # 02 Y:2023 02 2023 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $3,266 $4,565 Implemented
UW2305 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,115 $5,102 Implemented
UW2305 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,031 $0 Implemented
UD1057 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $133 $413 Not Implemented
UD1057 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,173 $0 Implemented
UD1057 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,974 $952 Implemented
UD1057 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $767 $3,117 Not Implemented
UD1057 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,676 $13,290 Implemented
UD1057 # 09 Y:2023 09 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,273 $24,175 Not Implemented
UD1057 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $7,417 $31,038 Not Implemented
UD1057 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $9,795 $480 Implemented
UD1057 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $1,200 Implemented
UD1057 # 03 Y:2023 03 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,326 $2,880 Not Implemented
UF0596 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,546,439 $3,990,000 Not Implemented