IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,596

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0541 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $2,400 Implemented
LE0541 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,345 $4,836 Not Implemented
LE0541 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,586 $8,304 Not Implemented
MA0851 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $135,448 $385,041 Implemented
MA0851 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $43,839 $169,678 Not Implemented
MA0851 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $28,576 $1,000 Implemented
MA0851 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,230 $3,215 Not Implemented
MA0851 # 05 Y:2023 05 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,872 $20,925 Not Implemented
MA0851 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,544 $5,977 Implemented
MA0851 # 07 Y:2023 07 2023 AVOID FROST FORMATION ON EVAPORATORS $434 $216 Implemented
UC2301 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,647 $0 Not Implemented
UC2301 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $600 Not Implemented
UC2301 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $407 $600 Not Implemented
UC2301 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $2,800 Not Implemented
UC2301 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $669 $3,250 Not Implemented
UC2301 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $1,959 $1,200 Not Implemented
UC2301 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $21,858 $127,920 Not Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
OR0767 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,167 $14,238 Not Implemented
OR0767 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $5,428 Not Implemented
WM0192 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,554 $9,300 Not Implemented
WM0192 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,356 $9,386 Implemented
WM0192 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,671 $0 Implemented
WM0192 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,383 $193 Implemented
WM0192 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $860 $2,040 Not Implemented