IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,624

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2211 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $6,616 Implemented
UW2211 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $760 Implemented
UW2211 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,186 $1,771 Implemented
UW2210 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,861 $2,080 Implemented
UW2210 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,799 $2,329 Implemented
UW2210 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $595 $0 Implemented
MS0406 # 01 Y:2022 01 2022 REPLACE BOILER $17,347 $165,000 Not Implemented
MS0406 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $0 Not Implemented
MS0406 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,220 $0 Implemented
SU0524 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,266 $0 Not Implemented
SU0524 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,837 $2,064 Not Implemented
SU0524 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,106 $875 Not Implemented
SU0524 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,422 $650 Not Implemented
SU0524 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $462 Not Implemented
SU0524 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $314 $510 Not Implemented
AM0862 # 01 Y:2023 01 2023 REPAIR OR REPLACE STEAM TRAPS $80,175 $8,170 Implemented
AM0862 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $27,516 $41,926 Implemented
AM0862 # 03 Y:2023 03 2023 REPAIR AND ELIMINATE STEAM LEAKS $18,325 $6,300 Implemented
AM0862 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,300 $9,000 Not Implemented
AM0862 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,080 $16,563 Implemented
AM0862 # 06 Y:2023 06 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $1,203 $4,750 Implemented
UA0263 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $474,477 $2,321,152 Not Implemented
UA0263 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $75,936 $24,406 Implemented
UA0263 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,564 $3,635 Implemented
UA0263 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,283 $500 Not Implemented