IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,990

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0135 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,900 $600 Implemented
ME0135 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $692 $0 Not Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
MO0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,626 $1,295 Implemented
MO0123 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,665 $88,767 Implemented
MO0123 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,145 $515 Implemented
MO0123 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $9,743 $4,240 Not Implemented
MO0123 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,740 $856 Not Implemented
MO0123 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,629 $20,506 Not Implemented
MO0123 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $207 $412 Implemented
MO0123 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,177 $2,885 Not Implemented
MO0123 # 09 Y:1994 09 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $915 $599 Not Implemented
DS0005 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $3,642 Implemented
DS0005 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $996 $360 Not Implemented
DS0005 # 03 Y:1994 03 1994 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $791 $1,080 Not Implemented
DS0005 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $132 Implemented
DS0005 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,476 $1,350 Implemented
DS0005 # 06 Y:1994 06 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,168 $10,209 Not Implemented
DS0005 # 07 Y:1994 07 1994 USE RADIANT HEATER FOR SPOT HEATING $15,539 $28,800 Not Implemented
DS0005 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $164 $744 Not Implemented