IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,768

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0568 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,828 $70,690 Implemented
WV0606 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $173,936 $85,154 Not Implemented
WV0606 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $9,895 $1,511 Not Implemented
WV0606 # 03 Y:2021 03 2021 DEVELOP A REPAIR/REPLACE POLICY $7,177 $729 Implemented
WV0606 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,685 $50 Implemented
WV0606 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,253 $314 Implemented
WV0606 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $1,819 $595 Implemented
LE0506 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,556 $11,500 Not Implemented
LE0506 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,000 Not Implemented
LE0506 # 03 Y:2021 03 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $36,412 $80,000 Not Implemented
LE0506 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,239 $800,000 Not Implemented
AS0511 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,444 $99 Not Implemented
AS0511 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,637 $1,885 Not Implemented
AS0511 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,999 $99 Not Implemented
AS0511 # 05 Y:2021 05 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,638 $9,000 Not Implemented
AS0511 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,161 $2,385 Not Implemented
AS0511 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $3,098 $765 Not Implemented
SU0505 # 01 Y:2021 01 2021 DISCONNECT BALLASTS $59 $0 Implemented
SU0505 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $0 Implemented
SU0505 # 03 Y:2021 03 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,333 $79 Implemented
SU0505 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $358 $393 Not Implemented
SU0505 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $108 Implemented
SU0505 # 07 Y:2021 07 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,193 $7,120 Not Implemented
NC0661 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,982 $3,360 n/a
NC0661 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $27,600 n/a