IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,581

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0332 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,892 $4,400 Implemented
KU0332 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,544 $10,200 Implemented
KU0332 # 06 Y:1991 06 1991 HEAT WATER WITH EXHAUST HEAT $6,621 $8,000 Implemented
KU0332 # 07 Y:1991 07 1991 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $904 $600 Implemented
GT0426 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,559 $300 Implemented
GT0426 # 02 Y:1990 02 1990 KEEP BOILER TUBES CLEAN $257 $200 Implemented
GT0426 # 03 Y:1990 03 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,520 $500 Not Implemented
GT0426 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $270 $0 Implemented
GT0426 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $133 Implemented
GT0426 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87 $141 Not Implemented
GT0426 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $419 $358 Implemented
GT0426 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $480 $0 Implemented
GT0426 # 09 Y:1990 09 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,331 $0 Implemented
CO0201 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $500 Not Implemented
CO0201 # 02 Y:1991 02 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,300 $1,500 Not Implemented
CO0201 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,350 $3,047 Not Implemented
CO0201 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,665 $5,400 Not Implemented
CO0201 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,665 $5,440 Not Implemented
CO0201 # 06 Y:1991 06 1991 INSTALL AUTOMATIC STACK DAMPER $1,000 $1,000 Not Implemented
CO0201 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $230 $400 Not Implemented
CO0202 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $700 Implemented
CO0202 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $551 $1,625 Implemented
CO0202 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $550 $1,500 Implemented
CO0202 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,533 $1,100 Implemented
WI0106 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $32,440 $10,800 Not Implemented