IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,809

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0562 # 07 Y:2020 07 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,484 $2,380 Not Implemented
UF0562 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $904 $0 Implemented
SF0565 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $770 $0 Not Implemented
SF0565 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $35,739 $5,236 Implemented
SF0565 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,884 $1,122 Not Implemented
SF0565 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $603 $135 Not Implemented
SF0565 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $294 $90 Not Implemented
SF0565 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,819 $622 Implemented
SF0565 # 07 Y:2021 07 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $445 $3,212 Not Implemented
SD0605 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,289 $0 Not Implemented
SD0605 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,006 $2,850 Not Implemented
SD0605 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,962 $5,000 Not Implemented
SD0605 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,760 $1,855 Not Implemented
SD0605 # 05 Y:2020 05 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,344 $100 Not Implemented
SD0605 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $804 $1,696 Implemented
SD0605 # 07 Y:2020 07 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $639 $2,000 Not Implemented
UA0237 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,741 $78,276 Implemented
UA0237 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,075 $9,020 Implemented
UA0237 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,989 $50 Implemented
UA0237 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,431 $551 Implemented
UA0237 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $985 $141 Implemented
UF0561 # 01 Y:2020 01 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $136,163 $259,600 Implemented
UF0561 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,219 $20,000 Implemented
UF0561 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,460 $31,240 Implemented
UF0561 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,358 $2,343 Implemented