IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,819

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0601 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $514 $1,425 Implemented
WV0601 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $530 Implemented
LS2007 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,423 $150 Not Implemented
LS2007 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,360 $13,000 Not Implemented
LS2007 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,236 $1,080 Not Implemented
LS2007 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,978 $559 Not Implemented
LS2007 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $235,346 $155,805 Not Implemented
LS2007 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $324 $970 Not Implemented
LS2007 # 07 Y:2020 07 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $75,962 $304,000 Not Implemented
LS2007 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $8,178 $56,728 Not Implemented
LS2007 # 09 Y:2020 09 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,595 $34,100 Not Implemented
AS0496 # 02 Y:2021 02 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,309 $3,941 Implemented
AS0496 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $2,587 $789 Implemented
AS0496 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,402 $3,920 Implemented
AS0496 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,262 $6,259 Implemented
AS0496 # 06 Y:2021 06 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $499 $35 Implemented
AS0496 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $474 $188 Not Implemented
AS0496 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $170 $275 Implemented
IC0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,228 $517 Implemented
IC0244 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,307 $4,150 Implemented
IC0244 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $534 Not Implemented
IC0244 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,190 $6,120 Not Implemented
IC0245 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $575 $517 Implemented
IC0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,465 $4,250 Implemented
IC0245 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $801 Implemented