Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,421
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0193 # 03 Y:1986 | 03 | 1986 | INSTALL SET-BACK TIMERS | $1,589 | $0 | Implemented |
UD0193 # 04 Y:1986 | 04 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,168 | $0 | Implemented |
UD0193 # 05 Y:1986 | 05 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,134 | $21,000 | Implemented |
UD0194 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,611 | $12,000 | Implemented |
UD0194 # 02 Y:1986 | 02 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,065 | $1,160 | Implemented |
UD0194 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,063 | $1,000 | Implemented |
UD0194 # 04 Y:1986 | 04 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,352 | $1,500 | Implemented |
UD0195 # 01 Y:1986 | 01 | 1986 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $10,751 | $0 | Implemented |
UD0195 # 02 Y:1986 | 02 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $418 | $0 | Implemented |
UD0195 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $58 | Not Implemented |
TN0275 # 01 Y:1986 | 01 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $5,736 | $3,400 | Not Implemented |
TN0275 # 02 Y:1986 | 02 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,746 | $10,000 | Not Implemented |
TN0275 # 03 Y:1986 | 03 | 1986 | REDESIGN PROCESS | $6,722 | $17,900 | Not Implemented |
TN0275 # 04 Y:1986 | 04 | 1986 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,462 | $12,675 | Not Implemented |
TN0275 # 05 Y:1986 | 05 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,628 | $375 | Implemented |
TN0275 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,571 | $1,300 | Implemented |
TN0276 # 01 Y:1986 | 01 | 1986 | INSULATE BARE EQUIPMENT | $4,831 | $95 | Implemented |
TN0276 # 03 Y:1986 | 03 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,515 | $5,000 | Not Implemented |
TN0276 # 04 Y:1986 | 04 | 1986 | INSULATE BARE EQUIPMENT | $566 | $1,851 | Implemented |
TN0276 # 05 Y:1986 | 05 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $746 | $3,600 | Not Implemented |
TN0276 # 06 Y:1986 | 06 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $373 | $500 | Implemented |
TN0276 # 07 Y:1986 | 07 | 1986 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $122 | $600 | Implemented |
TN0276 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $311 | $45 | Implemented |
GT0281 # 02 Y:1986 | 02 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,681 | $9,090 | Implemented |
GT0281 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,835 | $63,595 | Not Implemented |