IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,819

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0499 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,448 $4,525 Implemented
SU0499 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $627 $999 Not Implemented
SU0499 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,223 $75,235 Implemented
SU0499 # 07 Y:2020 07 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $345 $64 Implemented
UD1015 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $0 Implemented
UD1015 # 02 Y:2020 02 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,248 $309 Not Implemented
UD1015 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,267 $0 Implemented
UD1015 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $769 $1,080 Not Implemented
UD1015 # 05 Y:2020 05 2020 USE MULTIPLE-EFFECT EVAPORATORS $18,945 $26,742 Not Implemented
UD1015 # 06 Y:2020 06 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,958 $0 Not Implemented
UD1015 # 07 Y:2020 07 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,591 $0 Implemented
UD1015 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,442 $86,373 Not Implemented
UD1015 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $1,854 Not Implemented
UD1015 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,410 $28,400 Not Implemented
TT0238 # 01 Y:2020 01 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,385 $3,500 Implemented
TT0238 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,091 $75,890 Implemented
TT0238 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,222 $25,000 Not Implemented
TT0238 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,965 $22,780 Implemented
TT0238 # 05 Y:2020 05 2020 INCREASE EFFICIENCY OF TRUCKS $7,291 $24,565 Not Implemented
TT0238 # 06 Y:2020 06 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,836 $1,500 Implemented
TT0238 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,527 $350 Implemented
TT0238 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $511 $40 Implemented
BS0136 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $4,844 Not Implemented
BS0136 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $2,100 $3,760 Not Implemented
BS0136 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,951 $77,377 Not Implemented