IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,907

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1912 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,080 $363 Not Implemented
UK1912 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,123 $3,378 Not Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 07 Y:2019 07 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $16,009 $41,650 Not Implemented
UK1912 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $90,133 $6,406 Not Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
TT0230 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,000 $6,000 Not Implemented
TT0230 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,935 $39,040 Implemented
TT0230 # 04 Y:2019 04 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,630 $30,000 Not Implemented
TT0230 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,238 $3,200 Implemented
TT0230 # 06 Y:2019 06 2019 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $2,786 $10,000 Not Implemented
TT0230 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,661 $1,618 Implemented
TT0230 # 08 Y:2019 08 2019 INSTALL TIMERS AND/OR THERMOSTATS $289 $20 Implemented
AM0790 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $4,100 $5,300 Implemented
AM0790 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,921 $12,100 Implemented
AM0790 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $415 $510 Implemented
AM0790 # 05 Y:2019 05 2019 USE PHOTOCELL CONTROLS $235 $17 Implemented
CL1915 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $47,547 $200,000 Not Implemented
CL1915 # 02 Y:2019 02 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,899 $5,500 Implemented
CL1915 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,751 $41,281 Implemented
CL1915 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,899 $0 Implemented
NL0040 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $106,822 $130,000 Not Implemented
NL0040 # 04 Y:2019 04 2019 REPAIR OR REPLACE STEAM TRAPS $16,450 $4,500 Implemented
NL0040 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,400 $51,350 Implemented
NL0040 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,049 $18,439 Implemented