IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,967

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0530 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,120 $58,070 Implemented
SF0530 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $97,224 $532,260 Not Implemented
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
MA0794 # 02 Y:2018 02 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,204 $51,700 Not Implemented
MA0794 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,123 $4,092 Not Implemented
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $710 $2,583 Not Implemented
UK1807 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $106 $0 Implemented
UK1807 # 02 Y:2018 02 2018 INSTALL SKYLIGHTS $126 $40 Implemented
UK1807 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,341 $12,798 Implemented
UK1807 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,191 $690 Implemented
UK1807 # 05 Y:2018 05 2018 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $2,941 $378 Implemented
UK1807 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $290,152 $2,325 Not Implemented
UK1807 # 07 Y:2018 07 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $2,101 $500 Implemented
UK1807 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $213 $12 Implemented
UK1807 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,532 $3,400 Implemented
BS0115 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,957 $11,662 Not Implemented
BS0115 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $380 Not Implemented
BS0115 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,068 $280 Not Implemented
BS0115 # 04 Y:2018 04 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $977 $350 Not Implemented
BS0115 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,604 $144 Not Implemented
BS0115 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,334 $1,920 Not Implemented
BS0115 # 07 Y:2018 07 2018 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $23,770 $8,000 Not Implemented
SU0468 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,204 $316 Not Implemented
SU0468 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $2,578 $1,066 Not Implemented