IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,087

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0350 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $9,827 Not Implemented
SF0350 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $644 $4,267 Not Implemented
SF0350 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,126 $2,145 Not Implemented
SF0350 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $399 $492 Implemented
SF0350 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $1,332 Implemented
SF0350 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $300 Implemented
UA0013 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,856 $0 Implemented
UA0013 # 06 Y:2007 06 2007 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,112 $6,898 Not Implemented
UA0013 # 05 Y:2007 05 2007 USE OPTIMUM THICKNESS INSULATION $3,027 $279 Not Implemented
UA0013 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $17,411 $13,088 Implemented
UA0013 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,315 $47,838 Implemented
UA0013 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,905 $0 Not Implemented
UA0013 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,423 $700 Implemented
MI0158 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,886 $2,000 Implemented
MI0158 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,073 $40 Implemented
MI0158 # 08 Y:2007 08 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,282 $3,475 Not Implemented
MI0158 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,478 $5,967 Not Implemented
MI0158 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $13,330 $1,700 Implemented
MI0158 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,507 $1,210 Implemented
MI0158 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,963 $20,900 Implemented
MI0158 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,358 $46,238 Not Implemented
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
MA0626 # 06 Y:2007 06 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $395 $200 Not Implemented
MA0626 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $5,481 Not Implemented