IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66,788

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0051 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $1,025 $113 Implemented
LT0051 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,034 $422 Implemented
LT0051 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $0 Implemented
MA0056 # 01 Y:1986 01 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,510 $2,500 Implemented
MA0056 # 02 Y:1986 02 1986 COVER OPEN TANKS $157 $0 Implemented
MA0056 # 03 Y:1986 03 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,812 $1,700 Implemented
MA0056 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,380 $1,200 Implemented
KU0190 # 01 Y:1986 01 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,383 $50 Implemented
KU0190 # 02 Y:1986 02 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $215 $0 Implemented
KU0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $1,510 Implemented
KU0190 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $120 Implemented
KU0190 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $10 Implemented
KU0190 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $50 Implemented
KU0190 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $207 $0 Implemented
KU0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $2,592 Implemented
KU0191 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $423 $100 Implemented
KU0191 # 04 Y:1986 04 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $221 $0 Implemented
KU0191 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $525 $0 Implemented
OK0187 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $103 Implemented
OK0187 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $277 $700 Implemented
OK0187 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $40 Implemented
OK0184 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $796 $50 Implemented
OK0184 # 02 Y:1986 02 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,732 $1,800 Implemented
OK0184 # 03 Y:1986 03 1986 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,324 $1,200 Implemented
OK0184 # 04 Y:1986 04 1986 INSTALL TIMERS AND/OR THERMOSTATS $6,465 $2,800 Implemented