IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,044

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0115 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $175 $2,500 Implemented
GT0206 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,815 $200 Implemented
GT0206 # 02 Y:1984 02 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,580 $4,500 Implemented
GT0206 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $14,224 $9,000 Implemented
GT0208 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,150 $1,550 Implemented
GT0208 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,482 $6,948 Implemented
GT0208 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,580 $5,660 Implemented
GT0208 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,720 $0 Implemented
GT0208 # 05 Y:1984 05 1984 REDESIGN PROCESS $10,210 $20,000 Implemented
GT0208 # 06 Y:1984 06 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $18,300 $20,000 Implemented
GT0209 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Implemented
GT0209 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,672 $5,000 Implemented
KU0112 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $18,588 $1,074 Implemented
KU0112 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $795 $200 Implemented
KU0112 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $398 $400 Implemented
KU0112 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $2,800 Implemented
KU0112 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $286 $0 Implemented
KU0113 # 03 Y:1984 03 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $523 $1,010 Implemented
KU0113 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $431 $200 Implemented
KU0113 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $120 $160 Implemented
OK0116 # 02 Y:1984 02 1984 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $666 $0 Implemented
OK0116 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $605 $250 Implemented
OK0116 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $563 $300 Implemented
OK0116 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,720 $3,700 Implemented
OK0119 # 01 Y:1984 01 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $45 $500 Implemented