IAC logo
IAC Assessment: GT0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1984
Principal Product COTTON & SYNTHETIC YARN
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 334
Plant Area (Sq.Ft.) 0
Annual Production 15,800,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $753,045 15,716,882 kWh $0.05
Natural Gas $80,836 16,810 MMBtu $4.81
TOTAL ENERGY COSTS $833,881
RECOMMENDED SAVINGS* $46,442 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,442
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,150
Cost:
$1,550
- - $5,150 1,110 -
-
kWh
$5,150
1,110
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,482
Cost:
$6,948
$6,482 137,163 - - $6,482
137,163
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,580
Cost:
$5,660
$4,580 96,717 - - $4,580
96,717
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,720
Cost:
-
$1,720 35,170 - - $1,720
35,170
kWh
-
-
MMBtu
05: 2.5194 REDESIGN PROCESS Savings:
$10,210
Cost:
$20,000
$10,210 325,322 - - $10,210
325,322
kWh
-
-
MMBtu
06: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$18,300
Cost:
$20,000
$18,300 583,236 - - $18,300
583,236
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$46,442
Cost:
$54,158
$41,292 1,177,608 $5,150 1,110 $41,292
1,177,608
kWh
$5,150
1,110
MMBtu
TOTAL IMPLEMENTED Savings:
$46,442
Cost:
$54,158
$41,292 1,177,608 $5,150 1,110 $41,292
1,177,608
kWh
$5,150
1,110
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas