Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,082
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,462 | $1,440 | n/a |
UL2501 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $574 | n/a |
UL2501 # 04 Y:2025 | 04 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $592 | $0 | n/a |
UL2501 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $1,240 | $2,661 | n/a |
UL2501 # 06 Y:2025 | 06 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $141,151 | $58,367 | n/a |
UL2501 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $25,794 | $14,820 | n/a |
UL2501 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,468 | $929,060 | n/a |
UL2501 # 09 Y:2025 | 09 | 2025 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $38,672 | $8,000 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
NL0108 # 02 Y:2025 | 02 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $93,844 | $220,000 | n/a |
NL0108 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,935 | $695 | n/a |
NL0108 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $686 | $1,621 | n/a |
WM0240 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $17,534 | $48,125 | n/a |
WM0240 # 02 Y:2025 | 02 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,119 | $3,235 | n/a |
WM0240 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,951 | $2,250 | n/a |
WM0240 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,825 | $0 | n/a |
WM0240 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,748 | $0 | n/a |
DL0254 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,794 | $10,000 | n/a |
DL0254 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $943 | $0 | n/a |
DL0254 # 03 Y:2025 | 03 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,746 | $7,000 | n/a |
DL0254 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,650 | $4,699 | n/a |
DL0254 # 05 Y:2025 | 05 | 2025 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $6,715 | $20,000 | n/a |