Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,979
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ1010 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $498 | $380 | n/a |
MZ1010 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $580 | $404 | n/a |
MZ1009 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $82 | $160 | n/a |
MZ1009 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $695 | $190 | n/a |
MZ1009 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO HEAT WATER | $597 | $3,500 | n/a |
MZ1009 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,377 | $2,964 | n/a |
LT8419 # 01 Y:2024 | 01 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,341 | $3,255 | n/a |
LT8419 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,467 | $2,036 | n/a |
LT8419 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,386 | $123,010 | n/a |
LS2505 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,919 | $11,944 | n/a |
LS2505 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,223 | $5,320 | n/a |
LS2505 # 04 Y:2025 | 04 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,963 | $12,500 | n/a |
LS2505 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,808 | $187,200 | n/a |
LE0591 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $27,684 | $0 | n/a |
LE0591 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $482 | $140 | n/a |
LE0591 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,438 | $3,216 | n/a |
LE0591 # 04 Y:2025 | 04 | 2025 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,399 | $4,500 | n/a |
LE0591 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,984 | n/a |
LE0591 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $298 | n/a |
LE0591 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,746 | $62,882 | n/a |
UF0625 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,273 | $322,608 | n/a |
UF0625 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $33,462 | $12,390 | n/a |
UF0625 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,895 | $5,801 | n/a |
UF0625 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,440 | $6,188 | n/a |
UF0625 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $469 | n/a |