Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,645
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2313 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,566 | $0 | n/a |
UL2313 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,515 | $14,625 | n/a |
UL2313 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,755 | $917,406 | n/a |
UL2313 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,989 | $15,000 | n/a |
UU0238 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,223 | $4,080 | Implemented |
UU0238 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,624 | $12,621 | Implemented |
UU0238 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,670 | $22,500 | Not Implemented |
UU0238 # 04 Y:2024 | 04 | 2024 | CLEAN CONDENSER TUBES | $3,894 | $3,890 | Implemented |
UU0238 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,731 | $5,916 | Implemented |
KS2323 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $105,434 | $423,259 | n/a |
KS2323 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,211 | $5,240 | n/a |
KS2323 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $60 | n/a |
KS2323 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,542 | $20,493 | n/a |
KS2323 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,339 | $1,860 | n/a |
UA0279 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $2,262 | n/a |
UA0279 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,676 | $8,591 | n/a |
UA0279 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,760 | $1,000 | n/a |
UA0279 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $3,760 | $1,407 | n/a |
UA0279 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,977 | $7,874 | n/a |
UA0279 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,016 | $384 | n/a |
UA0279 # 07 Y:2023 | 07 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $161,801 | $1,711,707 | n/a |
UA0279 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,175 | $54,709 | n/a |
WM0208 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $37,878 | $122,100 | n/a |
WM0208 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,702 | $8,700 | n/a |
WM0208 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,761 | $1,950 | n/a |