Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,121
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0199 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $257 | $668 | Not Implemented |
IP0199 # 09 Y:2024 | 09 | 2024 | REPLACE BOILER | $434,522 | $2,000,000 | Not Implemented |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | Implemented |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | Not Implemented |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | Not Implemented |
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | Implemented |
UF0619 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,482 | $6,000 | Implemented |
UF0619 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,318 | $25,440 | Not Implemented |
UF0619 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,655 | $13,445 | Implemented |
UF0619 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,989 | $36,000 | Not Implemented |
UF0619 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,458 | $9,470 | Implemented |
UF0619 # 06 Y:2024 | 06 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,257 | $5,940 | Implemented |
UF0619 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $0 | Implemented |
UF0619 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $705 | $1,252 | Implemented |
NL0094 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $72,558 | $568,000 | Not Implemented |
NL0094 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,784 | $4,500 | Not Implemented |
NL0094 # 03 Y:2024 | 03 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,003 | $2,741 | Not Implemented |
NL0094 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $731 | $2,110 | Not Implemented |
NL0094 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $635 | $583 | Not Implemented |
NL0094 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $332 | $160 | Not Implemented |
NL0094 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $196 | $97 | Not Implemented |
MUCM20 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,363 | $0 | Not Implemented |
MUCM20 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $318 | $349 | Not Implemented |
MUCM20 # 03 Y:2024 | 03 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $124 | $0 | Not Implemented |
MUCM20 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7 | $0 | Not Implemented |