IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,645

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1067 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $1,800 Not Implemented
UD1067 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $965 $6,400 Not Implemented
UD1067 # 03 Y:2023 03 2023 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $377 $250 Not Implemented
UD1067 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,940 $143,080 Not Implemented
TT0304 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $74,585 $185,000 Not Implemented
TT0304 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,488 $40,000 Not Implemented
TT0304 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $5 Implemented
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 Implemented
TT0304 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $5,133 $300 Implemented
TT0304 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,000 $3,000 Not Implemented
TT0304 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $405 Implemented
TT0304 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $50 Implemented
UC2313 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $275 $0 n/a
UC2313 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,527 $1,500 n/a
UC2313 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,066 $3,500 n/a
UC2313 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $428 n/a
UC2313 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $1,300 n/a
UC2313 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $251 $50 n/a
UC2313 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,805 $75 n/a
UC2313 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $16,157 n/a
UC2313 # 09 Y:2023 09 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,673 $19,488 n/a
UC2313 # 10 Y:2023 10 2023 INSTALL TIMERS AND/OR THERMOSTATS $615 $1,053 n/a
LS2318 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,605 $90 Implemented
LS2318 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,425 $372 Implemented
LS2318 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $14,825 $3,000 Not Implemented