IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,236

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0920 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $20,630 $460,200 n/a
AM0920 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,640 $7,500 n/a
AM0920 # 04 Y:2024 04 2024 REPAIR FAULTY LOUVERS AND DAMPERS $4,125 $9,000 n/a
AM0920 # 05 Y:2024 05 2024 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,403 $1,000 n/a
UU0252 # 01 Y:2024 01 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $19,754 $108,000 Implemented
UU0252 # 02 Y:2024 02 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $53,389 $212,000 Implemented
UU0252 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,880 $5,500 Implemented
UU0252 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $4,410 Implemented
UU0253 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $26,630 $43,200 Not Implemented
UU0253 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,113 $26,430 Implemented
UU0253 # 03 Y:2024 03 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,211 $18,400 Implemented
UU0253 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $717 $2,200 Implemented
UU0253 # 05 Y:2024 05 2024 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $150 $450 Not Implemented
WV0662 # 01 Y:2024 01 2024 REDUCE VENTILATION AIR $36,465 $14,572 Not Implemented
WV0662 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,156 $46,100 Not Implemented
WV0662 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $8,386 $5,500 Implemented
WV0662 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $10,521 Implemented
WV0662 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,538 $6,417 Implemented
WV0662 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,172 $700 Implemented
WV0662 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $3,117 $2,250 Implemented
WV0662 # 08 Y:2024 08 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,752 $4,400 Not Implemented
WV0662 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,490 $392 Implemented
WV0662 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $750 Implemented
WV0662 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $945 Implemented
UC2405 # 01 Y:2024 01 2024 PAY UTILITY BILLS ON TIME $299 $0 n/a