IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,393

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0571 # 06 Y:2024 06 2024 USE POWER DURING OFF-PEAK PERIODS $492 $511 Implemented
AS0571 # 07 Y:2024 07 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $430 $987 Not Implemented
AM0918 # 01 Y:2024 01 2024 REDUCE FLUID FLOW RATES $1,310 $3,000 n/a
AM0918 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $25,377 $489,840 n/a
AM0918 # 03 Y:2024 03 2024 REPAIR FAULTY LOUVERS AND DAMPERS $412 $3,000 n/a
AM0918 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $2,244 $1,215 n/a
AM0918 # 05 Y:2024 05 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,601 $3,000 n/a
UC2403 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,885 $0 Implemented
UC2403 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $64 $0 Implemented
UC2403 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,934 $0 Implemented
UC2403 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,103 $428 Not Implemented
UC2403 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,880 $1,300 Implemented
UC2403 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,576 $50 Implemented
UC2403 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,612 Not Implemented
UC2403 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $333 Implemented
UC2403 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,517 $311,208 Not Implemented
NT0021 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,801 $7,120 Implemented
NT0021 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $19,175 $6,411 Not Implemented
NT0021 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,153 $11,393 Implemented
NT0021 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,821 $5,609 Not Implemented
NT0021 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,130 $0 Implemented
NT0021 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $88,000 $94,845 Not Implemented
KS2427 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $5,480 n/a
KS2427 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,216 $90 n/a
KS2427 # 03 Y:2024 03 2024 USE OPTIMUM THICKNESS INSULATION $9,550 $6,688 n/a