IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,082

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0371 # 03 Y:2025 03 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,555 $5,880 n/a
MZ0371 # 04 Y:2025 04 2025 REPLACE BOILER $383,764 $475,000 n/a
UD1109 # 05 Y:2025 05 2025 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,167 $4,639 n/a
UD1109 # 04 Y:2025 04 2025 UTILIZE A LESS EXPENSIVE COOLING METHOD $41,149 $75,000 n/a
UD1109 # 03 Y:2025 03 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,017 $2,784 n/a
UD1109 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,579 $0 n/a
UD1109 # 01 Y:2025 01 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,965 $2,310 n/a
IP0207 # 01 Y:2025 01 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,560 $0 n/a
IP0207 # 02 Y:2025 02 2025 OPTIMIZE PLANT POWER FACTOR $7,162 $5,708 n/a
IP0207 # 03 Y:2025 03 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $184 $227 n/a
IP0207 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $970 $1,387 n/a
IP0207 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,969 $3,653 n/a
UA0295 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $36,113 $1,750 n/a
UA0295 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,000 $8,591 n/a
UA0295 # 03 Y:2025 03 2025 UPGRADE CONTROLS ON COMPRESSORS $85,871 $42,000 n/a
UA0295 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,442 $4,771 n/a
UA0295 # 05 Y:2025 05 2025 INSTALL OCCUPANCY SENSORS $454 $2,418 n/a
UA0295 # 06 Y:2025 06 2025 USE RADIANT HEATER FOR SPOT HEATING $6,661 $23,010 n/a
UU0268 # 01 Y:2025 01 2025 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,676 $9,660 n/a
UU0268 # 02 Y:2025 02 2025 BURN A LESS EXPENSIVE GRADE OF FUEL $101,028 $4,860 n/a
UU0268 # 03 Y:2025 03 2025 INSTALL / REPAIR INSULATION ON STEAM LINES $8,514 $6,920 n/a
UU0268 # 04 Y:2025 04 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $31,296 $7,800 n/a
UU0268 # 05 Y:2025 05 2025 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $11,222 $30,630 n/a
UU0268 # 06 Y:2025 06 2025 USE OPTIMUM TEMPERATURE $680,810 $2,017,330 n/a
UU0267 # 01 Y:2025 01 2025 OPTIMIZE PLANT POWER FACTOR $3,730 $6,750 n/a