IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141,569

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0042 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,997 $0 Implemented
UD0042 # 05 Y:1982 05 1982 REDUCE GLAZED AREAS IN BUILDINGS $1,633 $3,410 Implemented
UD0042 # 06 Y:1982 06 1982 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $866 $4,000 Implemented
UD0043 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $380 Not Implemented
UD0043 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $700 Implemented
UD0043 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,488 $5,000 Not Implemented
TN0134 # 01 Y:1982 01 1982 COVER OPEN TANKS $12,000 $3,500 Not Implemented
TN0134 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $700 $4,000 Not Implemented
TN0134 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $10,000 $12,000 Not Implemented
TN0138 # 01 Y:1982 01 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $500 $1,000 Not Implemented
TN0138 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $1,500 Not Implemented
TN0138 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $800 Not Implemented
KU0056 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,692 $2,784 Implemented
KU0056 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,863 $2,000 Implemented
KU0056 # 03 Y:1982 03 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $16,065 $20,000 Implemented
KU0056 # 04 Y:1982 04 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,900 $450 Not Implemented
KU0056 # 05 Y:1982 05 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,800 $20,000 Implemented
KU0056 # 06 Y:1982 06 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $5,190 $1,724 Implemented
KU0056 # 07 Y:1982 07 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,225 $1,000 Implemented
KU0056 # 08 Y:1982 08 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,030 $2,940 Implemented
KU0057 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,441 $888 Not Implemented
KU0057 # 02 Y:1982 02 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,030 $2,800 Implemented
KU0057 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $545 $300 Implemented
KU0057 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $418 $438 Implemented
KU0057 # 05 Y:1982 05 1982 CHECK FOR ACCURACY OF UTILITY / POWER METERS $296 $0 Implemented