IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,047

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
TN0218 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $8,908 $15,000 Not Implemented
TN0218 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,382 $0 Not Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $180 Not Implemented
TN0218 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,078 $4,350 Not Implemented
TN0218 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $758 $0 Not Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
GT0219 # 01 Y:1984 01 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,420 $2,400 Implemented
GT0219 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,440 $6,000 Implemented
GT0219 # 03 Y:1984 03 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $736 Not Implemented
GT0219 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $295 Implemented
GT0219 # 05 Y:1984 05 1984 DISCONNECT BALLASTS $350 $303 Not Implemented
GT0220 # 01 Y:1984 01 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $590 $1,200 Not Implemented
GT0220 # 02 Y:1984 02 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $986 $1,840 Implemented
GT0220 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,170 $3,000 Implemented
GT0220 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $640 Implemented
GT0220 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $150 Implemented
GT0221 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,817 $500 Implemented
GT0221 # 02 Y:1984 02 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,716 $5,000 Not Implemented
GT0221 # 03 Y:1984 03 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $18,719 $15,000 Not Implemented
GT0221 # 04 Y:1984 04 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,089 $2,000 Not Implemented
GT0221 # 05 Y:1984 05 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,160 $10,000 Implemented
GT0221 # 06 Y:1984 06 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,900 $12,000 Not Implemented