Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148,153
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0332 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $82 | $137 | n/a |
IC0332 # 05 Y:2025 | 05 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,821 | $2,450 | n/a |
IC0332 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,189 | $1,828 | n/a |
IC0332 # 07 Y:2025 | 07 | 2025 | REPLACE BOILER | $17,004 | $104,568 | n/a |
IC0332 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $593 | $3,461 | n/a |
IC0332 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,248 | $81,420 | n/a |
OK1152 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $0 | n/a |
OK1152 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,879 | $2,304 | n/a |
OK1152 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,965 | $0 | n/a |
OK1152 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,489 | $20,639 | n/a |
OK1152 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,424 | $13,000 | n/a |
OK1152 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,453 | $208,600 | n/a |
OK1152 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,701 | $9,073 | n/a |
OK1152 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,737 | $16,196 | n/a |
OK1152 # 09 Y:2025 | 09 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,238 | $0 | n/a |
MZ0381 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,000 | $19,875 | n/a |
MZ0381 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $24,783 | $28,280 | n/a |
MZ0381 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,828 | $0 | n/a |
MZ0381 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $428,798 | $4,387,498 | n/a |
MZ0381 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $87,568 | $395,000 | n/a |
MZ0381 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $318,110 | $818,754 | n/a |
SU0578 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,025 | $0 | n/a |
SU0578 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,562 | $0 | n/a |
SU0578 # 03 Y:2025 | 03 | 2025 | DISCONNECT BALLASTS | $500 | $0 | n/a |
SU0578 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $442 | $0 | n/a |