Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,597
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0303 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,947 | $546 | n/a |
IC0303 # 13 Y:2024 | 13 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $3,324 | $1,624 | n/a |
IC0303 # 14 Y:2024 | 14 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $774 | $36 | n/a |
IC0303 # 15 Y:2024 | 15 | 2024 | INSULATE BARE EQUIPMENT | $2,406 | $1,236 | n/a |
IC0303 # 16 Y:2024 | 16 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,328 | $441,248 | n/a |
IC0303 # 17 Y:2024 | 17 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,739 | $211 | n/a |
WV0661 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,612 | $15,969 | n/a |
WV0661 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,983 | $9,744 | n/a |
WV0661 # 03 Y:2024 | 03 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,731 | $9,700 | n/a |
WV0661 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,626 | $12,165 | n/a |
WV0661 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,184 | $473 | n/a |
WV0661 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,021 | $3,645 | n/a |
WV0661 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $618 | $2,517 | n/a |
WV0661 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $523 | $314 | n/a |
WV0661 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $367 | $355 | n/a |
WV0661 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $233 | $140 | n/a |
WV0661 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $218 | $713 | n/a |
WM0223 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,737 | $8,466 | n/a |
WM0223 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,472 | $5,580 | n/a |
WM0223 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $994 | n/a |
WM0223 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $971 | $0 | n/a |
WM0223 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | n/a |
WM0223 # 06 Y:2024 | 06 | 2024 | USE PHOTOCELL CONTROLS | $406 | $200 | n/a |
UU0250 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $42,332 | $60,420 | n/a |
UU0250 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,742 | $49,723 | n/a |