Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,603
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0550 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,721 | $48 | n/a |
SU0550 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $758 | $80 | n/a |
SU0550 # 06 Y:2024 | 06 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $237 | $50 | n/a |
SU0550 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $129 | $76 | n/a |
SU0550 # 08 Y:2024 | 08 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $77 | $75 | n/a |
SU0550 # 09 Y:2024 | 09 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $24,107 | $24,000 | n/a |
SU0550 # 10 Y:2024 | 10 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,192 | $9,587 | n/a |
SU0550 # 11 Y:2024 | 11 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $530 | $847 | n/a |
SU0550 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,567 | $156,925 | n/a |
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | n/a |
AS0571 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,102 | $20,000 | n/a |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | n/a |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | n/a |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | n/a |
AS0571 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $430 | $987 | n/a |
AM0918 # 01 Y:2024 | 01 | 2024 | REDUCE FLUID FLOW RATES | $1,310 | $3,000 | n/a |
AM0918 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,377 | $489,840 | n/a |
AM0918 # 03 Y:2024 | 03 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $412 | $3,000 | n/a |
AM0918 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,244 | $1,215 | n/a |
AM0918 # 05 Y:2024 | 05 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,601 | $3,000 | n/a |
MS0425 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,979 | $25,000 | n/a |
MS0425 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,601 | $8,975 | n/a |
MS0425 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,008 | $1,523 | n/a |
MS0425 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,356 | $0 | n/a |
MS0425 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,396 | $255 | n/a |