IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0230 # 01 Y:2025 01 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $155,302 $120,000 n/a
WM0230 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $2,488 n/a
WM0230 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,667 $900 n/a
WM0230 # 02 Y:2025 02 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,743 $4,500 n/a
UD1097 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $14,406 n/a
UD1097 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $900 n/a
UD1097 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $63,287 $0 n/a
UD1097 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,544 $0 n/a
UD1097 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,568 $0 n/a
UD1097 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $320 n/a
UD1097 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $296 $0 n/a
NT0036 # 04 Y:2025 04 2025 OPTIMIZE PLANT POWER FACTOR $6,170 $16,268 n/a
NT0036 # 03 Y:2025 03 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,825 $0 n/a
NT0036 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,972 $5,609 n/a
NT0036 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $688 $0 n/a
IC0316 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,039 $346 n/a
IC0316 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $198 $144 n/a
IC0316 # 07 Y:2025 07 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $21,124 $3,628 n/a
IC0316 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,450 $3,794 n/a
IC0316 # 03 Y:2025 03 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $93 $379 n/a
IC0316 # 10 Y:2025 10 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $205 n/a
IC0316 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,822 $728 n/a
IC0316 # 12 Y:2025 12 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,025 $1,615 n/a
IC0316 # 13 Y:2025 13 2025 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $926 $1,541 n/a
IC0316 # 14 Y:2025 14 2025 REPLACE BOILER $36,754 $57,900 n/a